Scaffolding and Accessories BS1139

  • Square base with large contact surface, holes drilled on the surface to help fix the base to concrete or wooden pillars to make the scaffolding system sturdy and safe. – Dimensions: 36*1.5*150*5mm – Surface: galvanized/hot dipped galvanized – Material: stainless carbon steel, anti-corrosion, high strength
  • The solid U head jack is a type of head jack, used on the top of scaffolding, used as a shelf to put purlins and form a fixed floor support frame
    • - Size: Ø32/ Ø34*600, đầu U: 150*120*50*4mm
    • - Surface: Electro-Galvanized
    • - Material: stainless carbon steel, anti-corrosion, high reliability
    • - Standard: BS1139
  • Use in a narrow range where drop forged double clamp, drop forged swivel clamp cannot get in, flexible, convenient and sure to bring maximum safety to users Create joints with high bearing capacity, easy to dismantle when need
    • - Diameter: 48.3 mm
    • - Surface: Electro-Galvanized
    • - Material: stainless carbon steel, anti-corrosion, high reliability
    • - Standard: BS1139
  • Use to fix 2 pipes together at an angle of 900 to create certainty for the scaffolding system, providing maximum safety for users. Create joints with high bearing capacity, easy to dismantle when need
    • - Diameter: 48.3 mm
    • - Surface: Electro-Galvanized
    • - Material: stainless carbon steel, anti-corrosion, high reliability
    • - Standard: BS1139
  • Use in a narrow range that the drop forged double clamp cannot get in, flexible, convenient and sure to bring maximum safety to the user. Create joints with high bearing capacity, easy to dismantle when need
    • - Diameter: 48.3 mm
    • - Surface: Electro-Galvanized
    • - Material: stainless carbon steel, anti-corrosion, high reliability
    • - Standard: BS1139
  • The scaffolding ladder is designed with proportional, straight from top to bottom, creating certainty and safety for users
    • - Size: Ø48.3*3.2mm, 300mm*6m, 4m, 3m, 2m
    • - Length: 6m/ 5m/ 4m/ 3m/ 2m
    • - Thickness: 3.2mm
    • - Step distance: 300mm
    • - Surface: Electro-Galvanized
    • - Material: stainless carbon steel, anti-corrosion, high reliability
    • - Weight: 150 Kg
    • - Standard: BS1139
  • Scaffolding Metal Plank is a part that help workers to manipulate and move easily on high floors, ensuring safety during construction. Scaffolding Metal Plank is completely non-slip, ensuring the safety of workers during moving on the construction site
    • - Size: 250*50*1.2mm*3m/ 2m/ 1m
    • - Length: 3m/ 2m/ 1m
    • - Thickness: 1.5 mm, 1.2mm
    • - Surface: Pre-galvanized/ Hot dipped galvanized
    • - Standard: BS1139
  • Used to install scaffolding, steel pipes will be linked together by a system of accessories according to BS1139 standards with great bearing capacity and increased floor resistance - Size: 48.3 * 3.2mm*6m/ 5m/ 4m/ 3m/ 2m/ 1m - Length: 6m/ 5m/ 4m/ 3m/ 2m/ 1m - Length: 6m/ 5m/ 4m/ 3m/ 2m/ 1m - Surface: Hot dipped galvanized - Standard: BS1139
  • When working at height, especially installing scaffolding, the indispensable thing of the installation workers is the scaffolding tool bag, which makes it convenient not to have to go up and down many times, saving installation time. Bag can storing: pliers, hammers, screwdrivers, rulers,…
    • - Size: bag: 35*35*40mm, belt: 1.2m
    • - Material: leather
  • Use to fix the scaffolding metal plank with scaffolding pipe to make the scaffolding system sturdy, non-slip, vibration, quick, convenient, flexible and sure to bring maximum safety to the user Create joints with high bearing capacity, easy to dismantle when need
    • - Diameter: 48.3 mm
    • - Surface: Electro-Galvanized
    • - Material: stainless carbon steel, anti-corrosion, high reliability
    • - Standard: BS1139